Tuesday, 19 May 2015

ba3 - more progress

 A lot of progress has been made.

Here's the colour map for the wall. I put grime along where the tops of the appliances would be and along the bottom of the outer wall.

You can see that the cabinets have mold on them and that the fridge and oven have multiple scratch marks and patched of rust, especially close to the floor where they would be more likely to get kicked.

The floor texture also has more dirt around the appliances where it would have been more difficult to clean.
I'm very happy with how everything has come together so far. I still need to specular map some things and combine normal maps for surface texture with the normal maps already applied.

I am still to do ambient occlusion too.

No comments:

Post a Comment